Metoc Video | |
EirGrid HVDC Light East-West Interconnector | |
| Metoc is acting as Owner’s Engineer for all marine elements of the project, working in alliance with PB Power who is Owner’s Engineer and responsible for land elements and the overall project | |
Courtesy of EirGrid Plc – the Irish Transmission System Operator | |
Array & Export Cable Routeing | |
Video Copyright 2010 Metoc PLC - do not use without Metoc's permission. | |